Haha... Actually this is my daily job.... dealing with 7K...
The developer is very 奸 this is an industry practice site build by Mr.Lee "in-bound block-wiring will be build by HGC" (I refer to new buildings not buildings exist before HGC born). For buildings build by New World blockwiring = New World telecom.
For RC HGC is only one of the FTNS operator providing telecom services to residents of RC other FTNS operators if they are interested they can still submit proposal to BMO to build their network (for sure the BMO will delay them until HGC get most of the custoemrs la..)
If other operators (telephone or boradband) would like to provide service they can build their own network (but impossible now because you can see in the typical floor lift lobby ALL the conduits are covered by flase ceiling you and me will not allow other FTNS operators to open it as it will damage the lobby ceiling and ugly.) The second method is to rent the last-mile circuit built by the block-wiring operator =HGC (remember the leasing rate is a commercial deal between the FTNS operators HGC can charge a high high high rate then the other operators may difficult to rent from HGC).
Although it seems have so much barriers other FTNS operators are still able to provide service to the residents of RC HGC have not breach 7K. The problem already exist during the development stage.
Regarding the "0" monthly fee boradband services in most cases the developer already paid a large sum of money to the providing operator during the development stage thus we need to use it at least 2-3 years (according to the contract sign between HGC and RC developing co.).
To way forward we should form OC in short (Because IO is impossible right now as the formation of IO need a large portion of RC residents say "yes"). And keep track with BMO's service contract sign with relevant parties related to us after 2-3 years the end of contract we can decide our "life". But really not at this moment.
For the problem of RC is different we need to define the relationship first.
Is it really "送"? Cannot be sure at this moment most likely is not free this amount should be paid by the developer already. Even "送" it is not "送" to RC residents the contract is sign between the developer (Hotel and Residents Blocks) and HGC not BMO of RC and HGC.
We are also "serviced apartment" in relation with the Hotel the developer may only "送" to the Hotel like Satellite TV we are just sharing the singnal from the Hotel's facilities.
* As OFTA only can take care TELECOM operators but not BMO/other organization outside the regime of Telecom Ordinance (Cap. 106)
麗港城用 power socket 我地會用 RJ45 head
但其實 大家都係 1.5 M ....
你地覺得佢收貴左我地收得合唔合理?[/quote]
Management Fee is a big big revenue ar....
We are new buildings using Rj-45 from the socket of HGC then it should be HGC broadband rather than PowerCom la... If only 1.5MB kill them la... :twisted:
Is it really "送"? Cannot be sure at this moment most likely is not free this amount should be paid by the developer already. Even "送" it is not "送" to RC residents the contract is sign between the developer (Hotel and Residents Blocks) and HGC not BMO of RC and HGC.
Haha... Actually this is my daily job.... dealing with 7K...
The developer is very 奸 this is an industry practice site build by Mr.Lee "in-bound block-wiring will be build by HGC" (I refer to new buildings not buildings exist before HGC born). For buildings build by New World blockwiring = New World telecom.
For RC HGC is only one of the FTNS operator providing telecom services to residents of RC other FTNS operators if they are interested they can still submit proposal to BMO to build their network (for sure the BMO will delay them until HGC get most of the custoemrs la..)
If other operators (telephone or boradband) would like to provide service they can build their own network (but impossible now because you can see in the typical floor lift lobby ALL the conduits are covered by flase ceiling you and me will not allow other FTNS operators to open it as it will damage the lobby ceiling and ugly.) The second method is to rent the last-mile circuit built by the block-wiring operator =HGC (remember the leasing rate is a commercial deal between the FTNS operators HGC can charge a high high high rate then the other operators may difficult to rent from HGC).
Although it seems have so much barriers other FTNS operators are still able to provide service to the residents of RC HGC have not breach 7K. The problem already exist during the development stage.
Regarding the "0" monthly fee boradband services in most cases the developer already paid a large sum of money to the providing operator during the development stage thus we need to use it at least 2-3 years (according to the contract sign between HGC and RC developing co.).
To way forward we should form OC in short (Because IO is impossible right now as the formation of IO need a large portion of RC residents say "yes"). And keep track with BMO's service contract sign with relevant parties related to us after 2-3 years the end of contract we can decide our "life". But really not at this moment.[/quote]
We are new buildings using Rj-45 from the socket of HGC then it should be HGC broadband rather than PowerCom la... If only 1.5MB kill them la... :twisted:[/quote]
1. operator is powercom not HGC
2. it is 1.5MB
3. I can lend you some tools to kill them 8)